The biggest characteristic tower: (1) the standard section of the space is little chip, transport costs low. (2) tower overall intensity is high, most of the materials are used the tower Q345B (manganese steel), make use of the tower more security, the service life is longer. (3) due to the unique design, making the overall upper tower weight, reduce the prevailing wind direction, force reduction. (4) the flat roof top without tower cap design, more can apply the requirement of cross homework, and can even make full use of space and the effective high tower. (5) the forearm unique design has altered the forearm force situation, no longer tension and compression of alternating stress. (6) the forearm transformation convenient, do not need to be born can change the forearm arm. At the same time the connection of the festival is also very simple. (7) greatly reduce the disassembling of tower crane equipment needed for the lifting capacity requirements. Crew cut tower due to the elimination of the tower head, the unit of small, height of installation quality low, the biggest installation height of the tower at the same level than other reduce more than 10 m. Ordinary tower crane boom installation must be on the ground to arms